阿莱格里港口 2008

阿莱格里港口

2008
阿莱格里港口滨水区改造

地点
阿莱格里港,巴西

现状
图纸设计

建筑面积
140.000 sqm

客户

SECRETARY OF STATE FOR DEVELOPMENT AND
INTERNATIONAL AFFAIRS, RIO GRANDE DO SUL STATE

总承包
CONSTRUCCIONES Y COMERCIO CAMARGO CORREA

设计公司

B720 ARQUITECTOS
JAIME LERNER ARQUITECTOS ASOCIADOS

设计师
FERMÍN VÁZQUEZ, JAIME LERNER

项目团队

PECO MULET, JUAN PABLO PORTA, IVAN ARELLANO, LEONARDO NOVELO, NICOLÁS PERFUMO, ORIOL ROIG, SARA SANTOS, ALESSANDRO ZANCHETTA

The transformation of the Cais Mauá includes interventions in 2,5 km of coastal highway and 258.000m² of built area. Additionally, the transformation of the old fish market into a thematic recreational and commercial zone eliminates the existing barrier between the city and the waterfront. The large new buildings are situated at the ends of the site: two office towers at one end, and a hotel, exhibition hall, and commercial center at the other.

The rehabilitation of the Cais Mauá makes possible the introduction of large singular buildings which exist in harmony with the existing city, strengthening the image of a centralized urban area. Special efforts were made to connect the city center with the docks, thus mending the new torn urban fabric in the surrounding neighbourhood of la laguna Guaíba. Thus, the organic and fluid plazas of the docks are allowed to enter into the existing rigid city grid of La Guaíba. The open areas are reserved for pedestrian traffic, with careful landscaping treatment that includes protected green areas, building access routes, and parking zones.

此条目发表在Projects分类目录,贴了, , 标签。将固定链接加入收藏夹。

评论已关闭。